Course Name
Installation, Startup and Commissioning Pumps
Contact Hours
1.5
Approved Industry
Drinking Water and Wastewater
Partner Name
Geiger Pump and Equipment Company
Primary Contact
Alan Greve
agreve@geigerinc.com
610-459-5747 Ext.
Website
Description
Find out what to look for when inspecting a pump installation. Student will learn critical startup procedures for rotating equipment, and how piping and baseplate installation can affect the quality of alignment. Students will see a live demonstration of how installation and operating considerations can have a major impact on pump performance and expected service life.
Course Level
Basic thru Intermediate
Course Content
Installation of Pumps - Safety, Alignment and Grouting (30 Minutes)
Startup of Pumps - Motor Rotation, Lubrication, Venting (30 minutes)
Commissioning - Final Alignment, Operational check (30 minutes)
Target Audience
Entry level through seasoned operators can benefit from the course - introduction for the new operator and review for the experienced operator.
Training Format
Classroom